The custom kitchen cabinets went in this week. Installing these too were tricky, owing to the curved south wall. But they are solidly built and look terrific. Diane is an artist and has been doing this for many years.
I’m giving two and a half weeks to get the interior trim and stairs in. We’re simultaneously installing the ceramic tile and most of itshould be in at the end of this week.
We’re also templating for the granite countertops. The weather has been very cold but the kerosene heater inside allows us to continue staying warm and on schedule.